To immerse yourself in the Ortec Group is to look back on more than 30 years of success and multiple roots. Discover the major milestones that have shaped the Group’s history.

2024 – DECEMBER – ACQUISITION OF WEETEC

The Ortec Group strengthens its electrical and HVAC engineering activities serving energy-efficient building renovation by acquiring the Weetec Group.

2024 – OCTOBER – ACQUISITION OF SATERM

The Ortec Group develops its electrical and thermal engineering activities in Southeastern France.

2024 – SEPTEMBER – ACQUISITION OF 3C METAL

The Ortec Group and 3C Metal join forces to continue their development in high-potential regions and strengthen their metalworking expertise serving the energy sector.

2024 – JUNE – ACQUISITION OF ENGLOBE CORP.’S CONTAMINATED SOIL AND ORGANIC WASTE TREATMENT AND MANAGEMENT OPERATIONS

The Ortec Group strengthens its position in soil remediation by acquiring Englobe Corp.’s contaminated soil and organic waste treatment and management activities in North America, as well as its activities in the United Kingdom and France.

2024 – MARCH: ACQUISITION OF ALZÉO ENVIRONNEMENT

Alzéo Environnement, a specialist in sanitation and industrial works, joined Ortec Environnement on March 28, 2024. This merger enables the Ortec Group to strengthen its expertise and regional presence in Brittany.

2023 – NOVEMBER – ACQUISITION OF BSL STEEL

BSL Steel, a specialist in metalworking, joined the Ortec Group in November 2023. This merger strengthens the Group’s fabrication and assembly expertise to meet the challenges of the nuclear and industrial sectors in Northern France.

2022: ORTEC TURNS 30

2022

Several hundred Ortec employees gathered at the Group’s headquarters in Aix-en-Provence, and several thousand connected remotely on April 23, 2022, to celebrate the Ortec Group’s 30th anniversary. An opportunity to look back on 30 years of memories and projects — and to look ahead to the future.

2022: WELCOME ATMNI!

ATMNI, a company specializing in industrial cleaning and industrial maintenance, joined the Ortec Group and became part of the Ortec Environnement Le Havre agency. The Group thereby strengthened its service offering and intervention resources in industrial cleaning and industrial maintenance in the Le Havre region.

2022: ORTEC STRENGTHENS ITS POSITION IN CANADA

Ortec strengthens its position in North America with the acquisition of Veolia Canada’s industrial cleaning activities. The new entity, Ortec Environnement Services, brings together 550 people across 20 agencies in Canada dedicated to industrial cleaning and sanitation for industrial companies and public authorities.

2021: SPECIALIST IN THE MANUFACTURING OF SUBSEA STRUCTURES

Orsam Oil & Gas is awarded a major contract by Tullow and Technip as part of the JSE project, covering the construction of 1,300 metric tons of subsea structures (suction piles / manifold / gooseneck / jumpers, etc.) in Ghana.

2021: OGD + SOLÉO = ORTEC-SOLÉO

As part of its commitment to improving service quality and expanding its range of expertise, OGD formalizes the acquisition of Soléo. Ortec-Soléo thereby becomes one of the national leaders in a sector linked to climate challenges, particularly through the fight against soil sealing.

2021: REMEDIATION BY THERMAL DESORPTION

Ortec-Soléo Rhône-Alpes installs 350 heating cartridges, 50 extraction structures, three gas treatment units, and one water treatment unit to carry out major soil remediation operations at an industrial site in Pringy.

2020: RECOGNIZED KNOW-HOW IN METALWORKING

Friedlander Amiens wins a major order (36,000 inches / 200 metric tons) for the assembly of 84 tanks and mixers, as well as a steel structure, at the Nevers site of motor oil and lubricant manufacturer IGOL. The studies were carried out by SOM Industrie.

2020: KICK-OFF OF THE EAS-U CONTRACT WITH EDF

2020

SOM (studies) and Orys (piping) mobilize for the installation of new safety circuits for ten nuclear reactors (EAS-u) emergency spray circuits designed, if required, to cool fuel in the core and storage pools. Prefabrication is carried out in the new 4.0 workshop in Pierrelatte, covering 4,000 m² and offering real-time traceability and production monitoring.

2019: BRUNET WINS A CONTRACT WITH NANTES MÉTROPOLE

Brunet is awarded a purchase-order contract for development and maintenance work on heavy-current and low-current systems across the entire Nantes Métropole real estate portfolio (office redevelopment, lighting for industrial bays, construction of storage rooms and a refectory, circulation-area lighting).

2019: OIL LOGISTICS AT THE KARI DRILLING SITE

OSI Gabon carries out the studies, costing, and execution of oil logistics for the Kari drilling site, operated by Maurel & Prom. Ortec’s expertise is essential in ensuring equipment transfers to difficult-to-access sites.

2018: AN EXCEPTIONAL REMEDIATION WORKSITE ON THE BANKS OF THE SEINE

Ortec carries out remediation over 6,000 m² and to a depth of 13 meters at a former industrial site in Boulogne-Billancourt for BNP Paribas Real Estate. Known as “Operation MÉTAL 57,” this project, unprecedented in its complexity and its location in a highly urbanized area, is one of the largest remediation worksites in Île-de-France.

2018: ATTENDING THE PALACE OF VERSAILLES

The Ortec Île-de-France teams demonstrate exceptional know-how and precision in cleaning the basins and clearing the aqueducts that make up the vast, centuries-old hydraulic system of the fountains at the Palace of Versailles.

2018: TWO NEW CONTRACTS ON THE ITER PROJECT

Ortec design offices and Orys teams work with an innovative solution for welding shielded doors inside the Tokamak building, the heart of ITER. The Contracting Division wins another key contract related to the assembly of the cold sections of the future Tokamak.

2018: STRENGTHENING THE SONOVISION’S PRESENCE IN INDIA

Sonovision strengthens its presence in India, reaching more than 450 engineers and technicians and acting as a springboard for developing new markets in the Asia-Pacific region, with a first contract won in Southeast Asia.

2018: FRAMEWORK AGREEMENT FOR THE CONNECTION OF SIX OFFSHORE WIND FARMS

2018

SOM Ligeron provides the organizational PMO (Project Management Office) for RTE for the connection of six offshore wind farms. The teams set up the project management framework in synergy with SOM and Oralys (project document management).

2017: A PIVOTAL YEAR FOR THE DUS PROJECT

2017 : DUS

After taking part in the preliminary design phase of the program to install Ultimate Backup Diesel (DUS) generators in French nuclear power plants, Ortec begins work on 38 of the 58 reactors. Deployment is scheduled for completion at the end of 2018.

2016: FOUR BUSINESS DIVISIONS SERVING CUSTOMERS

2016 : 4 Pôles

The Group reorganizes around four business divisions: Engineering, Contracting France, Contracting International, and Global Services. This new organization aims to respond even more effectively to customer challenges by aligning business expertise with business sectors.

2013–2017: ACQUISITIONS CONTINUE

2013-2017 ACQUISITIONS

Ducamp in 2013, Sonovision in 2014, Cico Centre and VDLS in 2015, and Brunet in 2017: the Group’s various acquisitions enable Ortec to strengthen its presence in environmental services, aeronautical and aerospace engineering, civil nuclear, electrical engineering, low-current systems, and HVAC engineering.

2008, AN EVER-STRONGER FOCUS ON PEOPLE

2008 L'homme au centre

The Group creates the Casques d’Or (“Golden Hat” awards) to recognize Ortec’s employees and trades through their professional skills and workplace behaviors, as well as the “Ortec, La Vie Ensemble” project, whose programs provide support to employees facing difficulties in their daily lives. The following year, Ortec launches O’Métier, a plan designed to audit, confirm, strengthen, and develop skills. In 2012, ÉLÉE, the Group’s internal school (created in 2002) moves to Lançon-Provence and becomes a genuine technical training center.

2006: A NEW DIMENSION: 2005, CREATION OF VALORTEC

2005 VALORTEC

Valortec, the Group’s first treatment center, is created in Rognac (13) followed by several others. From 2012 onward, Ortec develops biocenters to treat polluted soils using the biopile technique: natural degradation achieved by stimulating bacterial activity. In 2013, the acquisition of Ducamp enables the Group to strengthen its offering with three additional centers: Antipol, TRD, and VTS.

2004: THE DIVERSIFICATION PROCESS CONTINUES

2004 DIVERSIFICATION

Oralys, an independent agency bringing together administrative engineering activities, is created while the Ortec Group continues its development across all areas, including internationally. In particular, Ortec begins transferring its “historic” trades in the oil and environmental sectors to the African continent.

2002: IMPLEMENTATION OF THE ORTEC VIGILANCE PLAN

2002 : Ortec Vigilance

Ortec Vigilance is launched: a genuine battle plan to improve the Group’s safety performance. In 2003, during the “Safety Estates General,” Ortec agency managers and QSE correspondents sign contracts to renew their commitment to safety by implementing customized action plans within each entity.

2000: THE FIRST FORUM FOR INDUSTRY DECISION-MAKERS

2000 : 1er Forum Ortec

The Group organizes its first Forum for Industry Decision-Makers, on the theme of outsourcing. During this event, which brought together Ortec’s largest customers, all guests were invited to reflect and exchange views on topics related to the economy and industry. Renamed O.FORUM, it has become an essential event, eagerly anticipated by recognized professionals in the sector.

1999: THE BEGINNING OF THE COMPREHENSIVE CONTRACT CONCEPT

1999 Contrats Globaux

Ortec is shortlisted by BP to manage maintenance at the Lavéra refinery (13) across all activities: assembly, lifting, mechanical work, piping, waste, industrial cleaning, electrical work, civil engineering, painting, and even green spaces. To win the contract, Ortec initiates a consortium of companies within NCM (Nouveau Contrat de Maintenance). The successful delivery of this contract, orchestrated by the Group, foreshadows the new Global Services concept, which is now the Group’s main offering.

1997–1998: CREATION OF NEW SUBSIDIARIES

1997-1998 NOUVELLES FILIALES

The Ortec Group continues its growth and diversification across many sectors with the creation of Orsem, a subsidiary dedicated to the recovery of non-toxic industrial sludge and polluted soils; Orys, specialized in nuclear maintenance; and Ortec-GSI, an expert in soil and subsoil remediation.

1996: ORTEC’S DEPLOYMENT: FRIEDLANDER JOINS THE GROUP

Plateforme pétrolière "offshore"

Through the acquisition of Friedlander, Ortec doubles its response capacity and strengthens its national and international network, particularly in Africa. It becomes a preferred partner for industrial companies by securing multi-year contracts. 1996 is also the year the Group moves its headquarters from Vitrolles to Aix-en-Provence (13).

1995: THE FIRST "CLEAN PLANT" CONTRACTS

Vue aérienne d'un site pétro chimique

Ortec launches its first “Clean Plant” contracts, designed to offer customers comprehensive management of waste from their plants or facilities. These types of contracts continue to enjoy strong success.

1994: MAJOR PROJECTS IN THE ENERGY SECTOR

1994 NUCLEAIRE

Ortec is tasked by the CIPN (Nuclear Fleet Engineering Center) with removing the reactor vessel heads from all French nuclear power plants. To carry out this operation, the Group sets up a modular, transportable, and dismantlable cable jack system, which will be used 10 years later to remove steam generators.

1992–1993: THE ENVIRONMENT, A PROMISING SECTOR

1992-1993 ENVIRONNEMENT

The Ortec Group makes a name for itself by carrying out major worksites in waste management and remediation, such as at the Grande Paroisse plant, a nitrogen fertilizer manufacturer south of Toulouse.

1992: ORTEC BECOMES INDEPENDENT

1992 INDEPENDANCE ORTEC

Through an operation known as “Ortec Buys Ortec,” Ortec’s senior managers buy out their entity through an LMBO (Leveraged Management Buy-Out): they commit their personal savings, with the remainder financed by a bank loan. This operation marks the official birth of Ortec, an independent, privately held industrial services group ready to embark on a new adventure.

1987–1989: THE BIRTH OF ORTEC

1987 ORTEC

With the acquisition of Buzzichelli in 1987, the DMIE strengthens its capacity to carry out works directly and expands its offering in assembly, lifting, and piping. It offers construction activities (new works) and diversifies into the nuclear sector. In 1989, a new organization is created, bringing together 20 subsidiaries from the DMIE and Buzzichelli. It is named Ortec.

1985: CREATION OF THE "DMIE"

1983 DMIE

Complementary trades operating in the industrial sector are grouped within the Industrial Maintenance and Environment Department (DMIE) bringing together the industrial agencies and SOM, forming a team of 300 people.

1980: CREATION OF SOM

1980 SOM

Within Onet, a department of the Group specialized in cleaning, André Einaudi creates SOM (Service, Organisation, Méthodes). The initial challenge is to respond to the Total Group, which is looking for an operator to organize the first production shutdown of its La Mède refinery. This structure, which makes it possible to fully outsource the shutdown while guaranteeing shorter execution times and an optimal level of safety and quality, is quickly called upon by many other industrial companies around the Étang de Berre (13).

1952: CREATION OF BUZZICHELLI

1952 BUZICHELLI

Dante Buzzichelli launches a lifting company in Martigues (13). His son Lilian follows in his footsteps by creating a second structure in 1957. The two merge in 1960 and move to Toulouse under the name Société Anonyme des Entreprises Buzzichelli. The company carries out two activities: lifting and mechanical assembly. From 1973 onward, the company takes part in the construction of offshore oil platforms in the North Sea, then, from 1975 onward, in the construction of French nuclear power plants. In 1983, Buzzichelli takes over Setip, a Vitrolles-based company specialized in piping installation.

1936: CREATION OF FRIEDLANDER

1936 FRIEDLANDER

Ferdinand Friedlander creates a boilermaking company to carry out maintenance work for oil mills and soap factories in Marseille. His son-in-law, Pierre Duclot, takes over the business in 1951 and diversifies its customer base by turning to major players in petrochemicals, then nuclear. In 1956, Friedlander produces the turbine cooling piping for the G1 reactor at Marcoule. In 1978, one year after being taken over by the GTM Group, the company takes its first step into Africa by participating in the construction of the SIR refinery (Société Ivoirienne de Raffinage).